Case Studies

Iron Acton 120 Megawatt Battery Energy Storage System (BESS) site

At the Iron Acton 120 Megawatt BESS site, Heighway delivered LV installation works across the 132 compound control room and HV room, alongside high-capacity...

Read the full case study

Claydon Solar Site

Claydon Solar Site required coordinated delivery across multiple voltage levels, with mechanical build activities inside the 132kV compound supported...

Read the full case study
Loading... Updating page...